 Results - Integrated steel mill   

Context / scope of project : The site was unprofitable and the primary line was operating significantly under its name plate capacity. PIP’s brief was to increase throughput on the primary line to allow an older line to be closed. PIP de-bottlenecked the primary line by tackling speed, availability and quality.

PIP and client achieved:

Throughput increased by 52%

$14m of annualised improvement
Simultaneous improvement in Safety, Speed, Availability and Non Prime
Old line closed









Back to top  |  Back to 'Our Results' page     


Back to 'Our Results' page
  

What we did:

Value driver trees – “Where’s the Money”
Accountabilities and KPIs
Cascading of operating targets
Reviews – shift handover, morning meetings, block reviews, weekly cascaded reviews
Identification, root cause analysis and reduction of major reasons for slow running
Root cause analysis of repeat maintenance failures
Equipment based maintenance strategies
Root cause analysis of repeat operational delays
Root cause analysis and reduction of Non Prime
Institutionalised learnings in response plans and SOPs


 