 |
|
What we did:
| Production: |
 |
Used value driver trees to identify key levers,
value/ease prioritisation of improvement ideas on key levers |
 |
KPIs cascaded down to operator level |
 |
Operator training on load factor, spotting |
 |
Installed frontline SPIN (short interval control) on truck
load factor, spotting times |
 |
Started reporting on “real” rather than “paper”
tonnes |

|
|
|