 Underground Coal Management Operating System

Context / Scope of project

Our client was an Australian mining operation with an open-cut and an underground mine producing metallurgical coal (semi-hard and semi-soft coking coal) and thermal coal.

The underground operations were consistently underperforming against production targets. Early assessment determined that by implementing a robust

MOS (Management Operating System) underground, performance-to-plan could be dramatically improved.

The MOS was supported by a customised software tool which automated:

  • Task Planning/Scheduling (both in the mine and in maintenance)
  • Sequencing
  • Compliance Management
  • Chain and time based triggers
  • Resource management and Scheduling (ops and maintenance)
  • Linkages between the mine plan and the ops and maintenance schedules
  • Progress/status reporting
  • Communication (between shifts and up/down the structure).

Client achieved:

  • More detailed and comprehensive planning process
  • Enhanced ability to react to change (within a shift, between shifts, over time)
  • Greater role clarity and single point accountability
  • Culture of stability and focus on productivity

graph


graph


graph


graph

 

 

Back to top  |  Back to 'Our Results' page     


Back to 'Our Clients' Results'
  

What we did:

  • Created and syndicated Value Driver Trees (VDTs) for the business
  • Created and syndicated site RACI to clarify roles and responsibilities
  • Mapped Management operating system (mine planning, longwall, development, maintenance)
  • Drove clarity and efficient execution across existing planning processes (Yearly, Quarterly, Monthly)
  • Created and embedded additional and more detailed planning processes
    • 24 hour, shift
  • Supplied extensive coaching (underground, across all shifts and rosters) to embed new/improved processes
  • Implemented “wiring”
    • Short Interval Controls at the mine face
    • Daily/Weekly Results Action Reviews (RARs)
    • Shift Handovers
    • Supervisory feedback loops
    • Visual Boards
    • “5 Whys” and RCA (Root Cause Analysis) tools
  • Implemented “Ideas Pipeline” for Continuous Improvement of processes
  • Identified and deployed KPIs at all levels (aligned to VDTs)
  • Created, installed and trained automated planning/tracking tool underground.

 


 