| Underground hardrock - debottlenecking drilling |
Context / Scope of project
PIP was engaged by a large Australasian mining house to work with a hard rock underground operation in Western Australia. Following a diagnostic of the operation, Drill and Blast was identified as the significant bottleneck to productivity on site.
Client achieved:
Tackling the drilling bottleneck, the client achieved (over the course of 4 months):
- Hourly drilling rates improved by 55% (by increasing utilisation and efficiency)
- Daily drilling rates improved 110% (by increasing availability and improving maintenance)
|