We analyse then address the causes of planned and unplanned
downtime, while improving the way your organisation responds
to downtime events.
Summary of Most Recent Maintenance Results
At one site all three levers of downtime were tackled, resulting
in a 58% reduction in downtime from the baseline (average
of past 12 months). This was done in the last year of a 5
year campaign life

At a second site unplanned maintenance and operations downtime
were tackled, resulting in a 53% reduction in downtime from
the baseline (average of past 12 months).
At company A, maintenance spend was reduced by 37% and capital
spend by 14%, whilst concurrently increasing availability
and reliability to deliver a 20% production increase

At company B, maintenance spend was held constant, whilst
concurrently increasing availability and reliability to deliver
a 35% production increase

At company C, maintenance spend was reduced by 12% and capital
spend by 44%, whilst concurrently increasing availability
and reliability to deliver a 25% production increase

Maintenance Spend: PIP has helped smelters to reduce maintenance
spend by up to 37% even when production increasing